Public Works Permits

PW permit

Apply for a Permit

Turnaround for issuance of a Public Works Permit is 14 BUSINESS DAYS. Please plan your permits accordingly. Thank you.

Winter Excavation Procedures

Effective October 15, 2023 - April 15, 2024

  • Clear barricades at night
  • Roadwork should be completed within a timely manner (months-long projects should wait until temperatures are consistently 45 degrees F and rising)
  • No steel plates
  • Winter backfill required – no PERMANENT asphalt until temperatures are consistently 45 degrees F and rising. 
    • Winter maintenance of sites required throughout cold months (patching trenches with temporary asphalt)
  • A full road closure may only be in effect from 9am-3pm, business days only


STANDARD PLANS FOR CONSTRUCTION

View the Standard Plans for Public Works Construction (PDF).

CURB/GUTTER/SIDEWALK STANDARDS OF CONSTRUCTION

View the Standard Plans of Construction for the 50/50 Curb, Gutter Sidewalk Program (PDF).